CUET-PG SERIES Water-resources-engineering
Lined And Unlined Canals
2 previous year questions.
Volume: 2 Ques
Yield: Medium
High-Yield Trend
2
2023 Chapter Questions 2 MCQs
01
PYQ 2023
medium
water-resources-engineering ID: cuet-pg-
Offsets are
1
Lateral meaurements made with respect to main survey lines
2
Perpendicular erected from chain lines
3
Taken to avoid unnecessary walking between stations
4
Measurements which are not made at right angles to the chain line
02
PYQ 2023
medium
water-resources-engineering ID: cuet-pg-
If fore bearing of a line is S49°52' E (assuming there no local attraction), the back bearing of the line will be
1
552°49' E
2
49°52' E
3
N49°08' E
4
N49°52' W
About Lined And Unlined Canals - CUET-PG
Lined And Unlined Canals is a vital chapter for CUET-PG aspirants. Mastering the concepts covered in this chapter is essential for securing a top rank.
By rigorously practicing the previous year questions associated with this chapter, you can identify high-yield topics, understand the examiner's perspective, and boost your confidence during the actual exam.
Frequently Asked Questions
Why focus on Lined And Unlined Canals PYQs?
Analyzing PYQs for this specific chapter reveals the most frequently tested concepts and the typical complexity of questions, allowing you to tailor your study plan efficiently.
How to best use this analysis?
Review the topic breakdown to see which sub-topics within Lined And Unlined Canals carry the most weight. Then, tackle the questions iteratively to solidify your understanding.