A facultative pond system for sewage treatment consists of two ponds in series. The hydraulic retention time (HRT) of each pond is 6 days. The total BOD reduction through the entire pond system is 90 %. If the ponds are considered to be completely mixed, then the rate constant describing the BOD removal is _______ day (rounded off to two decimal points). Assume that the entire rate constant is the same for both the ponds.