CUET-PG SERIES Water-engineering-and-management
Surveying And Levelling
9 previous year questions.
Volume: 9 Ques
Yield: Medium
High-Yield Trend
9
2024 Chapter Questions 9 MCQs
01
PYQ 2024
medium
water-engineering-and-management ID: cuet-pg-
The reduced level of a factory floor is 36.00 m, and the staff reading on the f loor is 1.40 m. The staff reading when held inverted with the bottom touching the Tee-beam of the roof is 3.67 m. What will be the height of the beam above the floor?
1
5.07 m
2
2.27 m
3
3.35 m
4
4.77 m
02
PYQ 2024
medium
water-engineering-and-management ID: cuet-pg-
In case of angular measurements being more precise than linear measurements, the traverse can be balanced by:
1
Graphical method
2
Bowditch rule
3
Transit rule
4
east-squares method
03
PYQ 2024
medium
water-engineering-and-management ID: cuet-pg-
For which of the following permanent adjustments of a theodolite is the spire test used
1
Adjustment of plate levels
2
Adjustment of line of sight
3
Adjustment of horizontal axis
4
Adjustment of altitude bubble and vertical index frame
04
PYQ 2024
medium
water-engineering-and-management ID: cuet-pg-
Find the magnetic declination if the magnetic bearing of the sun at noon is .
1
2
3
4
05
PYQ 2024
medium
water-engineering-and-management ID: cuet-pg-
Oblique offsets are used to
1
Locate broken boundary
2
Locate center of the building
3
Plot the drainage
4
Check the accuracy of the plotted work in chain survey
06
PYQ 2024
medium
water-engineering-and-management ID: cuet-pg-
Geodimeter is based on:
1
Propagation of modulated light waves
2
High frequency radio waves
3
Intermittent signal of high frequency near 500 MHz
4
Propagation of infrared radiation
07
PYQ 2024
medium
water-engineering-and-management ID: cuet-pg-
What will be the sag correction for a 100 m tape which is suspended between the ends under a pull of 10 N? The total weight of the tape is 12 N.
1
1 m
2
6 m
3
3 m
4
12 m
08
PYQ 2024
medium
water-engineering-and-management ID: cuet-pg-
Surveys which are carried out to indicate the inequalities of land surface and to depict the mountain, water bodies, woods, etc., are known as:
1
Cadastral Survey
2
City Survey
3
Topographical Survey
4
Hydrographical Survey
09
PYQ 2024
medium
water-engineering-and-management ID: cuet-pg-
The distance AB on the ground as measured on a plan drawn to a scale of 1 cm = 50 m was found to be 500 m. Later, it was detected that the surveyor wrongly used a scale of 1 cm = 40 m in the calculations. What will be the true length of the line AB?
1
400 m
2
512.5 m
3
625 m
4
412.5 m