Mr. Yash started a pen manufacturing unit. On the basis of several observations, it is determined that standard time taken by the worker to make one pen is 10 minutes. So the standard production of 6 pens was determined per hour for a worker. Identify which of the following type of study helped Yash to arrive at standard production per hour,
1
Motion Study
2
Time Study
3
Fatigue Study
4
Method Study